The End of
|
Construction loses $177 billion a year to the gap between the blueprint and the build. We exist to close it. EatherLabs builds smart, simple solutions for expensive, complicated problems.
Precision at Every Stage
Rapid Deployment
No training seminars. No expensive hardware setup. We simply connect to the files you already have. Upload your current drawings and specs, and we start validating the project logic on Day 1.
Deterministic Engine
We are replacing interpretation with logic. Our engine takes all your distinct project files, specifications, drawings, submittals, and schedules, and combines them into a single, cohesive system. The goal is simple: if the documents contradict each other, the project isn't ready to be built.
Financial Defense
Efficiency is nice, but certainty is better. We catch the hidden document conflicts that eventually drain your contingency budget, ensuring that the capital you allocate is the capital you actually spend.
Seamless Integration
Built for the Tools You Already Use
















Construction as Software
We take the scattered documents typical of construction and turn them into one reliable source of truth. Your BIM data, specs, drawings, and schedules are compiled into a unified view of what you actually intend to build.
Upstream of Capital
Rework isn't a jobsite problem, it's a logic problem. Documents disagree, people interpret them differently, and the risk piles up. We resolve those contradictions before construction even starts.
Explore SolutionsGeneral Contractors
Contractual Clarity. You need to know exactly what you are building before you mobilize. We identify conflicts between specs, drawings, and submittals so your team executes against one consistent plan rather than three different interpretations.
Developers & Owners
Financial Certainty. Don't fund projects built on contradictory documents. We validate that your BIM, specifications, and schedules act in agreement before you release capital.
Lenders & Insurers
Risk Mitigation. Replace assumptions with hard logic. We compile the contractual structure of the project to surface impossibilities before they become legal claims. If the documents conflict, the project is carrying preventable risk.
Engineering Certainty in the Built Environment
Our Mandate
We eliminate rework at the source. Construction usually fails because the documents disagree. The specifications say one thing, the drawings say another, and submittals introduce a third version of reality. We compile every document into a single system. If that system is inconsistent, we know the project is broken before work begins.
Our End State
We want to make construction executable. BIM becomes geometry we can test. Specifications become rules we can enforce. Schedules become logical constraints. Rework is reduced to a compile error that gets caught before the money is spent, not after.
$0B
Annual Market Leakage
0%
Process Inefficiency
0
Target Latency
Operational Superiority
We don't need to watch the construction site. We determine whether it is ready to exist in the first place.
Zero Hardware Required
No cameras, no scanners, and no devices on site. We use the documents that already exist. We take your BIM, specifications, drawings, submittals, and schedules, and turn your existing data into your protection.
The Pre-Construction Gate
Most tools react after the damage is done. We prevent the damage from being possible. We sit right before capital is deployed to verify that the project makes sense.
Court-Grade Truth
Camera systems make claims about what they see. We make claims about what is written. If we tell you "Clause 2.4.B contradicts Drawing A-302," that is a defensible fact. It aligns with how courts, banks, and insurers view the world.
The Method
We go from fragmented documents to executable truth in three steps.
Document Ingestion
We ingest every document that defines the project. BIM models, drawings, specifications, submittals, schedules, and change orders. We normalize all of them into one structured system.
Compilation
We build a graph that represents the contractual reality. Every requirement, dimension, and constraint is linked. When documents conflict, we identify the exact clause, drawing, or submittal responsible.
Conflict Report
You receive a precise, defensible report of contractual conflicts. Each issue is traced back to its source with exact references, allowing you to resolve it before the project is funded or built.